Side-by-side diff

Delta Air Lines, Inc. — Contingency Plan for Lengthy Tarmac Delays

Old
Full text
New
Full text

Snapshot 2026-10-14 08:17 UTC
Snapshot 2026-10-31 08:22 UTC
n1Contingency Plan for Lengthy Tarmac Delaysn1# Contingency Plan for Lengthy Tarmac Delays
22
n3---n3#### **Last Updated: Dec. 13, 2024**
44
n5#### Last Updated: Dec. 13, 2024n
6 
7### Overview5### **Overview**
86
9Before delays occur, Delta has a comprehensive plan designed to forecast and adj7Before delays occur, Delta has a comprehensive plan designed to forecast and adj
>ust to operational challenges and minimize lengthy delays while passengers are o>ust to operational challenges and minimize lengthy delays while passengers are o
>n board the aircraft. The Operations/Customer Center (OCC) at Delta's headquarte>n board the aircraft. The Operations/Customer Center (OCC) at Delta's headquarte
>rs is responsible for the daily execution of this plan, while keeping in mind th>rs is responsible for the daily execution of this plan, while keeping in mind th
>e safety and well-being of our customers.>e safety and well-being of our customers.
108
1614
17Delta has developed a detailed plan, with established trigger points, to account15Delta has developed a detailed plan, with established trigger points, to account
> for those times when unforeseen constraints have caused taxi delays. Delta's pl> for those times when unforeseen constraints have caused taxi delays. Delta's pl
>an meets or exceeds all limits imposed by this rule.>an meets or exceeds all limits imposed by this rule.
1816
n19### Plan Requirementsn17### **Plan Requirements**
2018
21Delta's contingency plan assures that Delta has sufficient resources to meet the19Delta's contingency plan assures that Delta has sufficient resources to meet the
> tarmac rule’s passenger egress requirements, including for diverted flights. Th> tarmac rule’s passenger egress requirements, including for diverted flights. Th
>e plan also ensures that Delta will meet or exceed the DOT’s specified guidance >e plan also ensures that Delta will meet or exceed the DOT’s specified guidance 
>for required onboard services during a tarmac delay, including: adequate food an>for required onboard services during a tarmac delay, including: adequate food an
>d potable water no later than two hours after the start of the tarmac delay (unl>d potable water no later than two hours after the start of the tarmac delay (unl
>ess the pilot-in-command determines that safety or security considerations precl>ess the pilot-in-command determines that safety or security considerations precl
>ude such service); operable lavatory facilities; appropriate medical attention; >ude such service); operable lavatory facilities; appropriate medical attention; 
>comfortable cabin temperature conditions, and other customer comfort needs.>comfortable cabin temperature conditions, and other customer comfort needs.
2220
23This plan ensures that Delta will meet or exceed specified guidance as it pertai21This plan ensures that Delta will meet or exceed specified guidance as it pertai
>ns to provisioning, as follows: adequate food and potable water no later than tw>ns to provisioning, as follows: adequate food and potable water no later than tw
>o hours after the start of the tarmac delay, unless the pilot-in-command determi>o hours after the start of the tarmac delay, unless the pilot-in-command determi
>nes that safety or security considerations preclude such service; operable lavat>nes that safety or security considerations preclude such service; operable lavat
>ory facilities; medical attention; cabin temperature conditions, and other custo>ory facilities; medical attention; cabin temperature conditions, and other custo
>mer comfort needs.>mer comfort needs.
2422
n25### Responsibilityn23### **Responsibility**
2624
27The OCC is responsible for the management and execution of the plan. The decisio25The OCC is responsible for the management and execution of the plan. The decisio
>n-making for this plan lies within the OCC. Airport Customer Service (ACS), Flig>n-making for this plan lies within the OCC. Airport Customer Service (ACS), Flig
>ht Operations, and In-Flight Service will carry out the plan at the station and >ht Operations, and In-Flight Service will carry out the plan at the station and 
>flight level.>flight level.
2826
n29### Station Plann27### **Station Plan**
3028
31The plan builds upon the standard operating procedures now in place to handle ex29The plan builds upon the standard operating procedures now in place to handle ex
>tended on-board delays and diversions. All stations have identified resources an>tended on-board delays and diversions. All stations have identified resources an
>d developed procedures that will allow them to effectively bring a plane off the>d developed procedures that will allow them to effectively bring a plane off the
> runway and open the door, giving the passengers the opportunity to disembark wi> runway and open the door, giving the passengers the opportunity to disembark wi
>thin specified time limits.>thin specified time limits.
3230
3432
35All Stations have coordinated plans with Airport Operations and local government33All Stations have coordinated plans with Airport Operations and local government
>al agencies (TSA and CBP where applicable) to meet the tarmac-delay rule's requi>al agencies (TSA and CBP where applicable) to meet the tarmac-delay rule's requi
>rements. This consists of contingency plans for fixing or replacing inoperative >rements. This consists of contingency plans for fixing or replacing inoperative 
>equipment, provisioning and servicing of aircraft, as well as gate or remote pad>equipment, provisioning and servicing of aircraft, as well as gate or remote pad
> parking considerations (including sharing facilities and making gates available> parking considerations (including sharing facilities and making gates available
> during an emergency).> during an emergency).
3634
n37### Communicationn35### **Communication**
3836
39Announcements are made by ACS when the aircraft is at the gate with the doors op37Announcements are made by ACS when the aircraft is at the gate with the doors op
>en. Once the doors close, announcements are made by the flight crew. The announc>en. Once the doors close, announcements are made by the flight crew. The announc
>ements will:>ements will:
4038
43- Explain the possible effect of the DOT's tarmac delay rule.41- Explain the possible effect of the DOT's tarmac delay rule.
44- Inform customers of the ability to egress, if the opportunity exists, beginnin42- Inform customers of the ability to egress, if the opportunity exists, beginnin
>g 30 minutes after scheduled departure (including revised departure time) and ev>g 30 minutes after scheduled departure (including revised departure time) and ev
>ery 30 minutes thereafter.>ery 30 minutes thereafter.
4543
n46### Aircraft Cabin Temperature Managementn44### **Aircraft Cabin Temperature Management**
4745
48Cabin temperatures will be continuously monitored by the crew during boarding an46Cabin temperatures will be continuously monitored by the crew during boarding an
>d after departure. If at any point cabin temperature falls outside at acceptable>d after departure. If at any point cabin temperature falls outside at acceptable
> levels for either the crew or passengers, the crew will promptly notify the Pil> levels for either the crew or passengers, the crew will promptly notify the Pil
>ot-in-command (PIC).>ot-in-command (PIC).
4947
50- While the aircraft is on the tarmac, the crew will attempt to adjust the cabin48- While the aircraft is on the tarmac, the crew will attempt to adjust the cabin
> temperature by lowering window shades and adjusting the aircraft's temperature > temperature by lowering window shades and adjusting the aircraft's temperature 
>controls.>controls.
51- If these efforts are insufficient and the temperature remains uncomfortable, t49- If these efforts are insufficient and the temperature remains uncomfortable, t
>he PIC may decide to return the aircraft to the gate or another suitable disemba>he PIC may decide to return the aircraft to the gate or another suitable disemba
>rkation point.>rkation point.
52- If the aircraft is at the gate, the PIC will coordinate with ACS to halt board50- If the aircraft is at the gate, the PIC will coordinate with ACS to halt board
>ing until the cabin temperature reaches acceptable levels.>ing until the cabin temperature reaches acceptable levels.
tt51 
52Next
53 
54 
55 AI Terms of Use
← Back to timeline